제품 생산 편의 및 효율을 위한 표준화 프로세스
Q-Program

제조를 완제품으로 완성하는 공정으로, 선도적이고 표준화된 금형 · 사출 제작 프로세스
‘Q-Program’을 통해 원하는 제품에 최적화된 방식으로 제작 및 구현이 가능합니다.

  • Q-Basic
  • Q-Advance
  • Q-Pro
  • Q-Mass

Q-Basic

Technical data

  • Core material
    Aluminum (DR 7079)
  • Mold base
    EF-TEK Q-PROGRAM MOLDBASE is used.
  • Guaranteed quantity of dies and molds
    1,000 shots
  • Production Cost
    30~40% of a mass production mold
  • Projection period
    7 days to 10 days

Q-Advance

Technical data

  • Core material
    HP4M, SKD61, NAK80, STAVAX
  • Mold base
    EF-TEK’s Q-PROGRAM MOLDBASE is used.
  • Guaranteed quantity of dies and molds
    50,000 shots
  • Production Cost
    30~40% of a mass production mold
  • Projection period
    10 days to 15 days

Q-Pro

Technical data

  • Core material
    KP4M(P20), STD61(H13), NAK80(P21), STAVAX(420), etc.
  • Mold base
    Manufacturing of mold base that is exclusive for Q-Pro
  • Guaranteed quantity of dies and molds
    200,000 shots
  • Initial mold manufacturing cost
    same as mass-production molds
  • Additional mold manufacturing cost
    approximately 50~60% of mass-production molds
  • Projection period
    25~30 days or more

Q-Mass

Technical data

  • Core material
    KP4M(P20), STD61(H13), NAK80(P21), STAVAX(420), etc.
  • Guaranteed quantity of dies and molds
    Up to 400,000 shots
  • Manufacturing time
    20~45 days or more
  • Material
    The manufacturing material for the Q-Mass dies and molds changes according to the shape and injection material.